伊人免费视频-伊人免费视频二-伊人免费视频网-伊人免费在线观看高清版-伊人欧美

-Language-
Access control system installation specification design
2018-11-06 17:14

The wiring control specification of Access control system

1. Access control system centralized power supply: Access control system lines are divided into two types: power line, signal line. The power cord mainly supplies power to the electric lock and the card reader. Under normal circumstances, the distance RVVP*0.5MM wire type is required within 50 meters, and the RVVP*1.0MM line is required for the distance of 50-100 meters. The signal line is a card reader communication signal line, an exit button control line, and a door magnetic signal line. Use twisted pair cable or shielded twisted pair cable and RVVP cable. Each Access control system is routed according to the equipment used.

Access control system installation specification design

2. Access control system power supply (remote control) The line only has signal lines, generally RVVP lines, twisted pairs, shielded twisted pairs. The signal line is divided into a card reader communication line, an electric lock control signal line, an exit button line, a door magnetic signal line, and various data lines. All power supplies are powered by an access control.

3. There is a breakpoint in the middle of the line of the Access Control system. The power-off line needs to be docked and insulated.

4. Line measurement: Test the line before wiring to avoid breakpoints in the middle of the line. After the line is laid, test the line immediately to test whether there is any break point in the wiring process. When installing the equipment, the same It is necessary to test the line to avoid damage to the line caused by other constructions after the wiring is installed.

5. Shielding treatment The line should be weakened by the wire slot. If there is no weak wire slot, please take the pvc bushing. If you can't take the pvc bushing, you need to leave the strong electric power to the maximum extent and all the wires are shielded and grounded.

Access control system

The Access control system before the installation of debugging

The Access control system needs to check the various devices in the access control before installation. Before starting, you need to test all the devices one by one to check whether the device is running normally and avoid hidden dangers during installation.

Steps for debugging: First test the access control power supply to avoid unstable power supply. The access control system is connected to the device for a unified power-on test. After power-on, each device should be tested for normal operation. If it is normal, it can be debugged as a whole.

The debugging of the Access control system needs to record the problems faced, organize the problems encountered in debugging, and give feedback to the manufacturer to obtain technical guidance.

Finally, with the completion of the debugging phase, you can actually install the Access control system to the access channel.


Keywords: access control system. http://www.coreimage.cn/index_en.html

Stephanie Stephanie Stephanie Ellie Ellie Ellie Victoria Victoria Victoria Olivia Olivia Olivia Isabella Isabella Isabella Jayden Jayden Jayden Lucas Lucas Lucas Dylan Dylan Dylan Ryan Ryan Ryan Noah Noah Noah

Sweep the concern Yingze electronic official WeChat

x
Sample Apply
※ Please fill in your information, our company will deal with your problem as soon as possible.
主站蜘蛛池模板: 岛国视频在线观看免费播放| 亚洲高清视频在线| 美国大片黄色| 国产精品国产亚洲精品不卡| 日韩一区国产二区欧美三| 91系列在线| 欧美特黄三级在线观看| 黄色免费三级| 日本精品中文字幕有码| 91精品国产美女福到在线不卡| 亚洲欧美日韩在线| 国产美女野外做爰| 激情网址大全| 久久草在线视频播放| 亚洲精品在线观看91| 99久久中文字幕伊人| 日日好吊妞| 亚洲黄色性视频| 玖玖玖免费观看视频| 国产无遮挡裸体免费视频在线观看| 黄色免费网站网址| semm亚洲欧美在线高清| 国产最新精品2020好看的| 一级片在线| 日本伊人精品一区二区三区| 好吊妞gao988在线播放| 国内自拍一区| 香港aa三级久久三级不卡| 精品国产一区二区三区成人| 久久亚洲国产精品| 色亚洲视频| 性插影院| jizz中国zz女人18| 午夜性爽快免费视频播放| 成人全黄三级视频在线观看| 免费看色片网站| 国产美女在线一区二区三区| 品爱网在线观看视频免费视频| 黄色毛片大全| 婷婷在线成人免费观看搜索| 91精品一区二区三区在线|